BCM System Report
This report displays a global view of the BCM (Business Continuity Management) system and its Business Impact Analysis.
Access path
To generate a BCM system report:
2. In the BCM system properties select the Reports page.
Report content
For each BIA the following columns are displayed:
Assessed object
BIA date
Business impact
*A business impact is the outcome of a disruption.
RPO
*The Recovery Point Objective (RPO) determines the point to which information used by an activity must be restored to enable the activity to operate on resumption or the maximum acceptable amount of data loss measured in time.
RTO
*The Recovery Time Objective (RTO) determines the maximum tolerable amount of time it takes to bring critical systems back online, possibly in a Degraded Mode. It is related to downtime, representing target time following an incident for Product or service delivery resumption, or Activity resumption, or Resources recovery.
WRT
*The WRT (Work Recovery Time) specifies the maximum of time tolerated to check the system and/or data integrity.
MTD
*The MTD (Maximum Tolerable Downtime) defines the total amount of time that a process can be disrupted without causing any unacceptable consequences.
*For more details on these indicators, see:
Applications
Roles (entities)
Risks
Filtering the report data
You can choose to to display only the data corresponding to some criteria:
(Example) To display the BIAs corresponding to a specific assessed object:
*Select a filter and a value: