HOPEX BCM > BCM-Related Reports > BCM System Report
BCM System Report
The report gives a global view of the BCM (Business Continuity Management) system and its BIAs (Business Impact Analyses).
Access path
To generate a BCM system report:
2. In the BCM system properties select the Reports page.
Report content
For each BIA, the following columns are displayed:
Assessed object
BIA date
Business Impact
*A business impact is the outcome of a disruption.
RPO (Recovery Point Objective)
*The RPO (Recovery Point Objective) indicates the maximum quantity of data it is acceptable to lose (in time units).
RTO (Recovery Time Objective)
*The RTO (Recovery Time Objective) is the time frame identified for resuming disrupted activities.
WRT (Work Recovery Time)
*The WRT (Work Recovery Time) specifies the maximum of time tolerated to check the system and/or data integrity.
MTD (Maximum Tolerable Downtime)
*The MTD (Maximum Tolerable Downtime) defines the total amount of time that a business process can be disrupted without causing any unacceptable consequences.
*For more information on the above indicators, see:
Applications
Risks
Roles (entities)
Filtering report data
You can choose to display data matching a specific criterion.
(Example) To display the BIA of a particular assessed object:
*Select a filter and a value as shown below: