Process Criticality and Supporting ICT Assets Table Overview
Path
To access this report:
1. In the navigation bar, click Reports > Create a report.
2. Use filters to find the Process Criticality and Supporting ICT Assets Table Overview report.
Illustrations
Table / Matrix
Report parameters
|
Parameters
|
|
|
List of processes
|
Optional
|
|
Entity
|
Mandatory
|
Report Content
This table presents:
• the result of the last BIA of the selected processes and entity
• the impact analysis displaying the list of ICT assets which support the processes
The following columns are available:
• Processes
• Criticality level: last criticality level computed on the BIA connected to the process and entity
• ICT asset type
• Application
• Software technology
• Deployed server
• Site
• Data center
• Facility
• Vendor
• ICT asset: name of the ICT asset
• Risk: risk connected to the ICT asset at risk
• Residual risk : last residual risk on the risk with the ICT asset as a context
• Risk action plan: action plan connected to the control ("To be started" or "In progress" status)
• Control: control connected to the risk
• Control level
• Control Action Plan: action plan connected to the control ("To be started" or "In progress" status)
Example