Critical ICT Assets (from Process/Entity)
Path
To access this report:
1. In the navigation bar, click Reports > Create a report.
2. Use filters to find the Critical ICT Assets (from Process/Entity) report.
Illustration
Table / Matrix
Report parameters
|
Parameters
|
|
|
Processes or Entity
|
Mandatory
|
|
Risk Type
|
Optional
|
Report Content
This report is displayed in the form of a table and contains the following columns:
• Critical process

A process is considered critical when at least one of the business impact values of the last BIA proved to be “Critical”.
• Entities
• ICT asset type
• ICT asset
• Risk
• Impact
• Likelihood
• Inherent risk
• Control Level
• Residual risk
• Risk action plan
• Control
• Control level
• Control action plan
Report example