Accessing risks
Access to risks is possible via control systems.
To create a risk specific to a control system from the Process Design pane:
1. Select Control & Risks > Hierarchy View.
2. Select a control system and click the Risks folder.
*The risks mitigated (limited) by a control system can be viewed in the Mitigated Risks section of the control system properties window. For more details, see "Control Systems", page 25.