Control Overview
The Overview page gives access to:
• A control card, which gives an overview of the main control characteristics
• Computed information in the form of a dashboard
Identification
An identification card summarizes the main control properties:
• Code
• Description
• Owner
• Execution mode
• Nature
• Key
Dashboard
Last assessment
This indicator enables to know when the last assessment was performed.
Latest compliance rate
The compliance rate relates to control execution check-lists. For more details on this functionality, see
Executing Controls.
Open issues
Open issues are issues for which the action plan was not completed.
Control level
Control level is the percentage of assessment nodes (objects assessed in each context for each respondent) that obtained “Pass” during the last direct assessment or assessment campaign.
If a control is being assessed in 2 contexts (for example 2 process categories) and that one of the assessment"Pass" the control level is 50%.
Control Level = Control Design (IC) * Control Efficiency (IC)