HOPEX IRM
>
HOPEX Internal Control
>
Control Testing
>
Preparing Tests
>
Planning Tests
Planning Tests
Test planning is carried out by the IRM Manager.
A test is assigned to a controller in the framework of a plan.
This site works best with JavaScript enabled