Concluding Tests
Test assessment reports
Reports allow the lead controller to best assess the test and analyze its action plans.
To access the Reports tab:
*In the properties of a test, select the Reports > Assessment page.
Several reports are proposed:
Action plan breakdown by priority (low, medium, high)
Issues by theme
Summary table of above elements
Generating test reports
The test report uses test elements.
To generate the test report:
1. In the properties of a test, select the Work Program page.
2. Click the icon of the test and select Deliverables > Test Report.
A message asks if you want to open or save the file.
3. Save the file to be able to modify and then submit it.
Assessing tests
To assess the test:
1. In the Characteristics page of the test properties, select the Summary section.
2. You can indicate:
Test Key Strengths
Test Key Weaknesses
3. In the Assessment field, specify a value from:
"Good overall level"
"Can be improved"
"Improvement needed"
"At risk"
Terminating tests
When the test is closed:
the test report is sent to persons interviewed
action plans are sent to their owner
Closing tests
When the test has been terminated, the internal control director can close it.
*Closing a test closes all objects at a lower level, with the exception of action plans and actions. When these objects have been closed you can no longer modify them.
*The administrator can exceptionally reopen these objects if necessary.