Concepts > Attributes (MetaAttributes) > Master Plan Start Date
Master Plan Start Date
The date from which all the calculations are made. This is time t0 for all master plan related events.
Translations
Type
AbsoluteDateTime64 (4) Standard
 
List of MetaClasses