PV-3 Project to Capability Mapping
The PV-3 metamodel makes the link between the project deliverables and periods of a resource architecture (SV-1) defined to support a capability (CV-2) and planned in a solution master plan (CV-3). A period can be linked to a state that matches one of the available resource architecture states.
PV-3 Metamodel