Concepts : Concepts used in HOPEX : Attributes (MetaAttributes) : Computed Start Date
   
Computed Start Date
A starting date computed from the absolute date of the time period or the starting delay if the relative mode is used for the belonging master plan.
Translations
Type
Float (8) Duration
Products
 
List of MetaClasses
Time Period.